云南昆明地區(qū)一種高承載電纜橋架
電纜橋架在石油、化工、電力、輕工、電訊等行業(yè)應(yīng)用非常廣泛,主要起到對(duì)電線、電纜成品的保護(hù)作用。現(xiàn)有的各種電纜橋架多是經(jīng)剪料、沖孔、折彎后成型,斷面簡(jiǎn)單、結(jié)構(gòu)呆板、加工速度慢。而且由于橋架跨度較大,承載的電纜及橋架自身重量也較大,為了保證承載能力且盡量減少橋架變形,壓制橋架材料也相應(yīng)變厚,這樣使得材料成本增加,不便于托盤(pán)式橋架的安裝運(yùn)輸且存在強(qiáng)度低、成本較高、散熱效果差的缺點(diǎn)。
如上所述,如何有效設(shè)計(jì)電纜橋架,使橋架能保證足夠剛度及承載力、控制材料成本并有較好的防止電線電纜在轉(zhuǎn)彎處受到磨損,利用高承載電纜橋架來(lái)解決上述問(wèn)題,是非常有必要的。
一種高承載電纜橋架,包括支架和壓輪裝置,所述壓輪裝置位于支架的轉(zhuǎn)角處,所述壓輪裝置設(shè)置有一個(gè)以上,所述支架包括擋片和固定件,所述擋片位于支架的兩邊開(kāi)口處、并與支架相固定,通過(guò)擋片將支架內(nèi)部的電線電纜阻擋起來(lái),擋住脫離支架,所述固定件設(shè)置有一個(gè)以上,所述固定件上包括螺紋孔和鉸軸,所述固定件上設(shè)置有兩個(gè)螺紋孔,所述鉸軸連接固定件和支架,通過(guò)固定件將支架固定在墻壁上,同時(shí)由于鉸軸,能夠使固定件根據(jù)不同的墻壁面進(jìn)行調(diào)節(jié)固定方式,使支架與墻壁相固定,所述壓輪裝置包括有壓輪箱,所述壓輪箱內(nèi)設(shè)置有壓輪和轉(zhuǎn)軸,所述轉(zhuǎn)軸貫穿壓輪并與壓輪箱相固定,通過(guò)壓輪能夠使電線電纜在支架內(nèi)移動(dòng)更加方便,同時(shí)有也避免電線電纜與支架內(nèi)轉(zhuǎn)角處處于摩擦狀態(tài), 避免電線電纜受到磨損。
Cable bridge is widely used in petroleum, chemical industry, electric power, light industry, telecommunication and other industries. The existing cable Bridges are mostly shaped by cutting materials, punching holes and bending, with simple section, rigid structure and slow processing speed. And due to large span bridge, carrying the cable and bridge its weight is bigger also, in order to guarantee the bearing capacity and minimize the bridge deformation, suppress bridge materials also becomes thicker accordingly, which makes the cost of materials increased, is not convenient to pallet bridge transportation and installation of low intensity, the shortcomings of high cost and poor heat dissipation effect.
As mentioned above, how to effectively design cable bridge, the bridge to ensure enough rigidity and bearing capacity, control the cost of materials and has better to prevent the wear of wire and cable in the corner, high load of cable tray is used to solve the above problem, it is necessary.
A high load of cable tray, including stent and roller device, roller device located in the corner bracket, described described pressure wheel set up more than one, stents, including block slice and fixed parts, described block slice in brackets on both sides of openings, and with the fixed bracket, by wire and cable inside block slice will support block, block from the scaffold, described a set more than one fixed, fixed pieces including threaded holes and hinged, fixed on a stated set have two threaded hole, hinged connection parts and fixed bracket, described by fixing parts to fix bracket on the wall, with hinged at the same time, Can make fixed a adjusted according to different wall surface of the fixed way that makes fixed bracket and wall, described pressure wheel device including a round box, described pressure wheel pressure wheel and rotating shaft is set in the oven, described a shaft through the roller and roller box, fixed by roller can make wire and cable in stent move more convenient, at the same time there are also avoid wire and cable and stent corner in the friction state, avoid wire and cable by wear and tear.
Contact Us
友情鏈接: